据今日挪威4月7日报道,挪威能源巨头Equinor和西班牙能源公司Naturgy签署了一项协议,在加那利群岛海岸开发和建造浮动海上风力涡轮机。
西班牙政府计划到2030年开发30亿瓦的海上风力发电。西班牙第一次海上风力拍卖将于2023年在加那利群岛地区举行。
Equinor可再生能源业务发展总监Jens kland表示:“我们希望为该国的可再生能源长期计划做出贡献,并开发商用的浮动海上风电场,这可能是西班牙第一个。”
根据介绍,西班牙90%以上的海上风力发电区域都是深水区,这意味着西班牙很有可能成为欧洲下一波海上漂浮风力发电的前沿。
季廷伟 摘译自 今日挪威
原文如下:
Equinor to build offshore wind turbines off the coast of the Canary Islands
quinor and the Spanish energy company Naturgy entered into an agreement on the development and construction of floating offshore wind turbines off the coast of the Canary Islands.
Spanish authorities plan to develop up to 3 gigawatts (GW) of offshore wind power by 2030. The first Spanish offshore wind auction will occur in the Canary Islands region in 2023.
“We want to contribute to the country’s plans for renewable energy in the long term and develop what could be the first commercial floating offshore wind farm,” Jens kland, Equinor’s director of business development in renewable energy, said.
More than 90% of Spanish offshore wind areas are deep-water areas, which means that Spain is well-positioned to be at the forefront of the next wave of floating offshore wind in Europe.
免责声明:本网转载自其它媒体的文章及图片,目的在于弘扬石化精神,传递更多石化信息,宣传国家石化产业政策,展示国家石化产业形象,参与国际石化产业舆论竞争,提高国际石化产业话语权,并不代表本网赞同其观点和对其真实性负责,在此我们谨向原作者和原媒体致以崇高敬意。如果您认为本站文章及图片侵犯了您的版权,请与我们联系,我们将第一时间删除。