bp和林德联合开发大型CCS项目

   2022-05-19 互联网综合消息

78

核心提示:据MRCHUB网站5月18日莫斯科报道,英国石油公司日前表示,该公司和林德公司宣布计划推进位于得克萨斯州的一

据MRCHUB网站5月18日莫斯科报道,英国石油公司日前表示,该公司和林德公司宣布计划推进位于得克萨斯州的一个大型碳捕获和存储(CCS)项目,该项目将使林德公司现有的设施能够生产低碳氢。

该开发还将支持从其他工业设施捕获的二氧化碳(CO2)的储存——为得克萨斯海湾沿岸工业走廊的大规模脱碳铺平道路。

一旦完成,该项目将从林德在大休斯敦地区的氢生产设施捕获并存储二氧化碳,也可能从其在得克萨斯州的其他设施捕获二氧化碳,为该地区生产低碳氢。这些低碳氢将通过林德的氢管网出售给客户,并与客户签订长期合同,生产低碳化学品和燃料。

作为该项目的一部分,英国石油公司将评估、开发并批准永久性封存二氧化碳的地质储存地点。英国石油的贸易和航运业务旨在为该项目带来定制的低碳解决方案,包括可再生能源和认证天然气,以及大宗商品交易和价格风险管理专业知识。

林德将利用其专有技术和运营专业知识,从该项目的制氢设施中捕获和压缩二氧化碳。该项目连同其广泛的制氢设施基础设施和通过其横跨得克萨斯墨西哥湾沿岸的管道网络连接的储存洞穴,将使林德能够提供具有成本效益、可靠的低碳氢,并与bp一起提供碳捕获和储存解决方案。

预计最早于2026年投入运营的该整体开发项目,也将使该地区其他大型工业设施的二氧化碳捕获和储存成为可能,并最终可在多个陆上地质储存地点每年储存多达1500万吨二氧化碳——相当于每年减少约300万辆汽车的碳排放量。

郝芬 译自 MRCHUB

原文如下:

bp and Linde to develop large-scale CCS

bp and Linde announced plans to advance a major carbon capture and storage (CCS) project in Texas that will enable low carbon hydrogen production at Linde’s existing facilities, said the company.

The development will also support the storage of carbon dioxide (CO2) captured from other industrial facilities – paving the way for large-scale decarbonization of the Texas Gulf Coast industrial corridor.

Upon completion, the project will capture and store CO2 from Linde’s hydrogen production facilities in the greater Houston area – and potentially from its other Texas facilities – to produce low carbon hydrogen for the region. The low carbon hydrogen will be sold to customers along Linde’s hydrogen pipeline network under long-term contracts to enable production of low carbon chemicals and fuels.

As part of the project, bp will appraise, develop and permit the geological storage sites for permanent sequestration of the CO2. bp’s trading & shipping business aims to bring custom low carbon solutions to the project, including renewable power and certified natural gas, along with commodity trading and price risk management expertise.

Linde will use its proprietary technology and operational expertise to capture and compress the CO2 from its hydrogen production facilities for the project. Together with its extensive infrastructure of hydrogen production facilities and its storage cavern connected through its pipeline network across the Texas Gulf Coast, this project will enable Linde to supply cost-effective, reliable low carbon hydrogen and, together with bp, provide carbon capture and storage solutions.

The overall development, expected to be operational as early as 2026, will also enable capture and storage of CO2 from other large industrial facilities in the region and could ultimately store up to 15 million metric tons per year across multiple onshore geologic storage sites – the equivalent of taking approximately 3 million cars off the road each year.



免责声明:本网转载自其它媒体的文章及图片,目的在于弘扬石化精神,传递更多石化信息,宣传国家石化产业政策,展示国家石化产业形象,参与国际石化产业舆论竞争,提高国际石化产业话语权,并不代表本网赞同其观点和对其真实性负责,在此我们谨向原作者和原媒体致以崇高敬意。如果您认为本站文章及图片侵犯了您的版权,请与我们联系,我们将第一时间删除。
 
 
更多>同类资讯
  • china
  • 没有留下签名~~
推荐图文
推荐资讯
点击排行
网站首页  |  关于我们  |  联系方式  |  使用说明  |  隐私政策  |  免责声明  |  网站地图  |   |  工信部粤ICP备05102027号

粤公网安备 44040202001354号