爱沙尼亚Paldiski液化天然气终端即将完工

   2022-06-01 互联网综合消息

93

核心提示:据5月31日Neftegaz.RU.报道,拉赫佩雷湾疏浚工程持续了10天,由比利时Jan de Nul公司拥有的Pedro Alvares C

据5月31日Neftegaz.RU.报道,拉赫佩雷湾疏浚工程持续了10天,由比利时Jan de Nul公司拥有的Pedro Alvares Cabral号船只进行作业。

该公司与同行投资公司informtar合作建设了基于FSRU(浮式储存气化装置)的液化天然气进口终端。

Paldiski液化天然气终端的完工将分两个阶段进行。

第一阶段将包括与Balticconnector管道连接的施工和FSRU的租赁。然后,在第二阶段,还将为终端构建永久解决方案。

Alexela表示,天然气管道是LNG终端中最小的部分,但就重要性而言,它与终端和FSRU一样重要,因为没有管道连接,终端无法操作。

此外,爱沙尼亚Elering公司正在为输电网络建立必要的管道连接。

今年4月,爱沙尼亚和芬兰透露,他们正在合作租赁一个大型浮式液化天然气(FLNG)终端,以迅速摆脱对天然气的依赖。

该FSRU将位于芬兰海岸,紧邻天然气输送网络。

5月初,Gasgrid Finland和Elering签署了一项合作协议,根据该协议,如果芬兰的港口结构尚未完成,FSRU可能在今年冬天位于爱沙尼亚的一个港口。

5月末,Gasgrid芬兰公司与excerate Energy公司签署了一份为期十年的FSRU租赁合同,该船拥有150900立方米液化天然气存储能力,每年可以提供超过50亿立方米的再气化能力。

王佳晶 摘译自 Neftegaz.RU.

原文如下:

Paldiski LNG terminal in Estonia step closer to completion

In a social media post,it is informed that the dredging work in Lahepere Bay lasted for 10 days.

It was carried out by the vessel Pedro Alvares Cabral, owned by the Belgian company Jan de Nul.

The company is partnered with compatriot investment firm Infortar on the FSRU-based LNG import terminal.

The completion of the Paldiski LNG terminal will take place in 2 stages.

The 1st stage will include the construction of the connection with Balticconnector pipeline and the rental of a FSRU.

Then, in the 2nd stage, a permanent solution will also be built for the terminal.

Alexela said the gas pipeline is the smallest part of the LNG terminal, but in terms of content it is as vital as the quay and the ship; the terminal cannot be operated without the pipe connection.

Estonian transmission network company Elering is to establish the necessary pipe connections.

In April, Estonia and Finland revealed they are teaming up to lease a large floating LNG (FLNG) terminal to quickly break free from dependence on gas.

This FSRU will be located on the Finnish coast in the immediate vicinity of the gas transmission network.

In early May, Gasgrid Finland and Elering signed a cooperation agreement under which the FSRU may be located in an Estonian port this winter if the port structures are not yet completed in Finland.

Later in May, Gasgrid Finland signed a ten-year charter party agreement with Excelerate Energy to lease to charter the Exemplar FSRU.

The vessel has a storage capacity of 150,900 cbm of LNG and can provide more than 5 billion  per year of regasification capacity.



免责声明:本网转载自其它媒体的文章及图片,目的在于弘扬石化精神,传递更多石化信息,宣传国家石化产业政策,展示国家石化产业形象,参与国际石化产业舆论竞争,提高国际石化产业话语权,并不代表本网赞同其观点和对其真实性负责,在此我们谨向原作者和原媒体致以崇高敬意。如果您认为本站文章及图片侵犯了您的版权,请与我们联系,我们将第一时间删除。
 
 
更多>同类资讯
  • china
  • 没有留下签名~~
推荐图文
推荐资讯
点击排行
网站首页  |  关于我们  |  联系方式  |  使用说明  |  隐私政策  |  免责声明  |  网站地图  |   |  工信部粤ICP备05102027号

粤公网安备 44040202001354号